CONSTRUCTION
INTRACO E&C is confident that it can meet the requirements of customers regardless of project size, working environment and regional culture. We always strive to complete projects within budget, comply with all safety regulations, ensure progress and quality meet high quality standards.
We arrange high-quality human resources for key positions of the project, supervision team for each specific job, ensure project safety and quality, and offer construction construction measures. construction and management system appropriate to the site condition.
In addition, we always apply the latest construction technologies and available modern equipment to our construction projects to improve labor productivity, while speeding up progress and ensuring quality. construction.
With years of experience in planning and building high-brain projects, our project engineers always discuss and come up with solutions to all problems in a timely manner. quickly and efficiently to complete the project on schedule.
1. FEASIBILITY STUDY – BIDDING STAGE
INTRACO E&C uses accumulated knowledge from many different projects, analyzes and evaluates the conditions of each specific plant to adjust the most suitable construction plan, as well as apply optimal measures. administrative costs and other fixed costs to improve bids.
2. STARTING CONSTRUCTION PROJECTS AT SITE
The project management team consists of people with the most experience in areas E (Engineering), P (Procurement) and C (Construction).
During detailed design. We arrange people with experience in construction in conjunction with the design team to ensure feasible technical measures and options at the construction site, shortening the time in the process of updating and modifying at the site.
The team of experts in charge of construction management has experience in detailed construction planning, contracts, and schedule control. Make sure to calculate carefully with the most suitable measures
Selection of experienced subcontractors who have worked with prestige and long-term companionship with Intraco E&C
Prepare temporary works for construction such as offices, construction roads, electricity, water, material warehouses, waste collection areas, wastewater treatment and other works. Ensure the best for the construction of work items.
In addition, in the early phase of the project, depending on the progress and construction process (known as the Buildability Study), the construction team will plan accordingly to the requirements and send feedback. for the early stages, including basic design and procurement, to ensure the project is optimized.
3. CONSTRUCTION AT CONSTRUCTION – COMPLETE
Once the basic design and procurement work is almost completed, the construction team will begin on-site preparations to ensure a smooth implementation of the work. Manpower, materials and equipment will be deployed at the site. All service equipment must be checked for safety before being put on the site. At the same time, materials must ensure technical requirements according to the design, strictly comply with construction methods of each stage. Besides, controlling labor safety for people, works and quality according to the standards to ensure the quality of the best construction works is a top priority. Continuously monitor the actual construction progress with the planned schedule and make timely adjustments to ensure the construction progress is on time.
4. OPERATION AND MAINTENANCE
The installation process is finished. A team of engineers with experience in operation and commissioning will be arranged to check and prepare for the test run
Ensuring safety during commissioning is a top priority. Fully equipped measuring and dedicated test equipment
The operation team works closely with the equipment supplier from the installation, testing and development stages to ensure the safe operation of the equipment.
To ensure the progress of project handover. The partial test run for the system is conducted in parallel and concurrently with the construction process.
INTRACO E&C always aims to execute the project smoothly and without incident, wishing to contribute to the success of the project and ensure that the plant is put into operation in the shortest time.